Subgrade Preparation Before Laying a Geomembrane: A Checklist

2026-11-22

The ground beneath it does more than anything else to determine the life of a geomembrane. Even the best liner can be damaged on stony, loose or uneven ground. Check the points below one by one before installation.

Surface

  • Have sharp stones, roots, debris and foreign objects been removed?
  • Are there any holes, humps or sudden level changes left?
  • Has the ground been compacted, or do footprints still show?

Slopes and corners

  • Is the slope angle one at which the liner will stay in place?
  • Have corners been rounded rather than left sharp?
  • Has an anchor trench been dug at the top of the slope?

Water and weather

  • Is there standing water or mud on the subgrade?
  • Has drainage been considered for groundwater or gas?
  • Are wind and rain on the day suitable for installation?

Protection layer

On stony ground, laying a geotextile under the liner reduces the risk of puncture. Once preparation is complete, the geomembrane can be laid.

Send us your project details using the form below and we will help you choose the right product.

← All articles

Request a Quote

Tell us what you need and our sales team will reply with a price offer shortly.

GEOSER +90 552 445 20 25
Hello 👋
How can we help you?